Lompat ke konten utama
KNKT
Penerbangan Final Report Serious Incident

Boeing 737-900ER PK-LFI — Sultan Syarif Kasim II Airport, Pekanbaru

Nomor investigasi
KNKT.11.02.04.04
Waktu kejadian
Lokasi
Sultan Syarif Kasim II Airport, Pekanbaru
Wilayah administratif
KOTA PEKANBARU, RIAU

Kronologi & deskripsi kejadian

During landing roll, the aircraft overun into RESA area

Data teknis

Data teknis kejadian Boeing 737-900ER PK-LFI — Sultan Syarif Kasim II Airport, Pekanbaru
Operator / maskapai Lion Air
Registrasi PK-LFI
Tipe pesawat Boeing 737-900ER
MTOW above 5,700 kg
Tahun pembuatan 2007
Tipe operasi AOC 121
Fase penerbangan Landing (LDG)
Jenis kejadian Runway Excursion
Jenis kejadian II Overrun
Dimensi runway 2240 x 30
Kode / nomor runway Code 4
Kondisi runway Wet

Faktor penyebab & kontributor

Faktor I
Environment

Sarana & operator terkait

Daftar sarana dan operator yang terlibat
Operator Flight Number Registrasi Tipe Pesawat Mtow Tahun Pembuatan Tipe Operasi
Lion Air PK-LFI Boeing 737-900ER above 5,700 kg 2007 AOC 121

Rekomendasi keselamatan yang diterbitkan

Penerima: Angkasa Pura II Branch Office Sultan Syarif Kasim II Airport

  • CLOSED 0 tanggapan

    Conduct periodic runway friction test to ensure the runway friction is within the approved value

    Lihat butir & lini masa tanggapan
  • CLOSED 0 tanggapan

    Ensure that weather observation sensor shall be put in a location that free of any possible disturbance according to the ICAO Annex 3, 4.5: Observing and reporting of surface wind

    Lihat butir & lini masa tanggapan
  • CLOSED 0 tanggapan

    Conduct rubber deposit removal with approved method and personnel in a period according to the DGCA Advisory Circular number SE.04 issued in 2012;

    Lihat butir & lini masa tanggapan

Penerima: Directorate General of Civil Aviation

  • OPEN 0 tanggapan

    Ensure that weather observation sensor shall be put in a location that free of any possible disturbance according to the ICAO Annex 3, 4.5: Observing and reporting of surface wind.

    Lihat butir & lini masa tanggapan
  • OPEN 0 tanggapan

    Ensure all aircraft operators to conduct proper flight crew training on the Approach and Landing Accident (ALAR) including the criteria of stabilised approach to be included in the simulator training

    Lihat butir & lini masa tanggapan
  • OPEN 0 tanggapan

    Ensure that all airport operator conduct rubber deposit removal with approved method and personnel in a period according to the DGCA Advisory Circular number SE.04 issued in 2012;

    Lihat butir & lini masa tanggapan
  • OPEN 0 tanggapan

    Ensure that all airport operator conduct periodic runway friction test to ensure the runway friction is within the approved value

    Lihat butir & lini masa tanggapan

Penerima: Lion Air

  • OPEN 0 tanggapan

    Pilot should calculate the landing distance required based on the actual wet runway condition.

    Lihat butir & lini masa tanggapan
  • OPEN 0 tanggapan

    To provide a comprehensive system to ensure the electrical power to the CVR disconnect immediately after the serious incident to prevent automatic overwritten of the information

    Lihat butir & lini masa tanggapan
  • OPEN 0 tanggapan

    To emphasis the flight crew training on the Approach and Landing Accident (ALAR) including the criteria of stabilised approach to be included in the simulator training.

    Lihat butir & lini masa tanggapan