Lompat ke konten utama
KNKT

Rekomendasi keselamatan

Setiap investigasi KNKT dapat menghasilkan butir rekomendasi yang ditujukan kepada regulator, operator, atau instansi lain. Buka satu butir untuk melihat lini masa tanggapan instansi penerimanya.

Butir rekomendasi keselamatan — 16 data, halaman 1 dari 1.
Nomor Moda Instansi penerima Isi rekomendasi Terbit Status Tanggapan
04.O-2024-23.01 Penerbangan Trigana Air Service When the pilot advanced both power levers to the notch, engine torque and NP increased as expected. After that, right engine torque continued increasing to a maximum of 116 percent... OPEN 0
04.O-2016-27.2 Penerbangan Trigana Air Service The data download of the FDR installed on PK-YSY aircraft retrieved 20 parameters recorded on the FDR. The limited parameters recorded on the FDR contributed to FDA analysis and in... OPEN 0
04.O-2021-05.01 Penerbangan Trigana Air Services The QRH of an engine failure might refer to “Engine Fire or Severe Damage or Separation” or “Engine Limit or Surge or Stall” which required memory items, which should be performed... OPEN 0
04.O-2021-05.02 Penerbangan Trigana Air Services The Operation Manual Part A (OM-A) subchapter 8.3.19.3.3 required pilot to conduct approach briefing using Threat and Error management concept.Prior to the approach, the PF briefed... OPEN 0
04.O-2021-05.03 Penerbangan Trigana Air Services The Quick Reference Handbook subchapter MAN 1.4 described procedure to response Ground Proximity Warning System (GPWS). The procedure required Pilot Flying and Pilot Monitoring to... OPEN 0
04.O-2020-27.1 Penerbangan Trigana Air Service KNKT recommend during approach descend about 400 feet AGL and the pilot did not see the runway, the PM reminded to the PF that they were too far and suggested to go around. The rem... OPEN 0
04-O-2020-3-1 Penerbangan Trigana Air Services Trigana had issued the Engineering Instruction (EI) identified by number B737-EI/32/083R1 with the title DVI Main Landing Gear Shimmy Damper Bolt. However, the EI did not reflect t... OPEN 0
04.O-2014-7.02 Penerbangan Trigana Air Service To develop a system or procedure to ensure a safe operation to aerodrome or airportthat has not been flown for more than 12 months as it has not been included in theCompany Operati... OPEN 0
04.O-2014-7.03 Penerbangan Trigana Air Service During the final approach, there was unresolved discrepancy between the pilots. It isrequire to ensuring pilot compliance to the good CRM as such during the LineOperation Safety Au... OPEN 0
04.O-2014-7.04 Penerbangan Trigana Air Service The PIC action to recover the situation was differed to the technique and statement inthe AOM.The cornering technique shall be well briefed to ensure the understanding toall pilots... OPEN 0
Tanpa nomor Penerbangan Trigana Air Services Ensure that the correct sealant type for the wing tank application and correct procedure to be followed to avoid uncured process of it. OPEN 0
Tanpa nomor Penerbangan Trigana Air Services Ensure the actual of fuel quantity on both fuel tanks was equal and balance prior departure. OPEN 0
Tanpa nomor Penerbangan Trigana Air Services Ensure that the wing tank is clean and free from debris. OPEN 0
Tanpa nomor Penerbangan Trigana Air Services Ensure the FDR and CVR read out and calibration in accordance to the manufacture standard and should be done by approved repair station. OPEN 0
Tanpa nomor Penerbangan Trigana Air Services Ensure that the modification of fuel system referred to service bulletin No ATR42-28-039 and technical instruction No: 006/ENG-07/2008, was tested referred to the correct procedure... OPEN 0
Tanpa nomor Penerbangan Trigana Air Services Review and improve the Implementation of CRM and technical knowledge. OPEN 0